Which of the following shows in schematic form how a product is assembled?

An assembly chart is to be considered as a schematic form the way a product is going to bring together. It comprises of materials as well as operations.

Show

Which of the following shows to assemble items?

Understanding a Bill of Materials (BOM) It is a list of the items needed to create a product as well as the instructions on how to assemble that product.

Which of the following documents lists the operations including assembly?

A bill of materials (BOM) is a comprehensive list of parts, items, assemblies, subassemblies, intermediate assemblies, documents, drawings, and other materials required to create a product.

Which of the following documents list the operations necessary to produce the component with the material specified in the bill of material?

An assembly drawing lists the operations necessary to produce the component.

What shows in schematic form how a product is assembled?

An assembly chart is to be considered as a schematic form the way a product is going to bring together. It comprises of materials as well as operations.

Which of the following provides a complete list of components required for manufacture of a product?

A bill of materials (BOM) is an extensive list of raw materials, components, and instructions required to construct, manufacture, or repair a product or service.

Which of the following documents lists the operations including assembly?

A work order is a listing of the components, their description, and the quantity of each required to make one unit of the product. An assembly drawing lists the operations necessary to produce the component. An assembly chart shows an exploded view of the product, usually via a three-dimensional or isometric drawing.

What does a route sheet provide?

A route sheet is a document which lists the exact sequence of operations needed to complete the job. The route sheet is intended to accompany parts moving individually or in batches.